Algeria's Leading Service Provider

Defining Excellence in
Well Intervention

Founded in 2016, MPS is a leading independent provider of Advanced Well Testing & Petroleum Services. We deliver rapid mobilization, elite technical capabilities, and a zero-incident safety track record for the most demanding onshore environments globally.

0+

Years of Operation

0+

Projects Delivered

0k

PSI Rated Capacity

0/7

Hour Mobilization

Comprehensive Engineering Solutions

Delivering state-of-the-art capability in high-pressure testing, water management, surface operations, and logistical heating environments.

Sand Management System Sand Management System Sand Management System Sand Management System Sand Management System
Sand Management System Sand Management System Sand Management System Sand Management System

Sand Management System "SMS"

10 Kpsi 1.2 Tons/Pot

Recognized leaders in Flow-back and post-frac clean-up operations, ensuring optimal load recovery and protecting downstream facilities.

A successful long-duration well clean-up operation was completed in South Algeria (Roud El Nouss), demonstrating operational efficiency and field expertise. Our trailer-mounted Sand Catchers feature a capacity of 1.2 tons per pot, well-suited for upstream refinery applications and single well testing.

MPS has engineered a compact, integrated sand catcher and sand filter unit, ensuring operational flexibility:

  • Interchangeable screen filters ranging from 50 to 900 µ
  • Upstream Mega-Sand Management System (High-pressure Cyclones) deployed to capture heavy solids, allowing continuous operation without shutdown.
Mobile Testing unit Mobile Testing unit Mobile Testing unit Mobile Testing unit

Advanced Well Testing

3 & 4 Phases 1440 & 2160 PSI

Complete Well Test Spreads to accurately determine Productivity Index and reservoir capacity.

Our mobile testing units (3 & 4 phases test separators 1440 psi & 2160 psi) are equipped with the latest instrumentation technologies. Integrating advanced instrumentation to deliver rapid deployment and high-efficiency well testing performance in dynamic field environments.

  • Optimized for inline testing (rig and rig-less)
MPS EOR well testing MPS EOR well testing MPS EOR well testing MPS EOR well testing

EOR & Fluid Analysis

50 BBL Heating Tanks 60 m³ Mobile Trucks

MPS demonstrates advanced expertise in Enhanced Oil Recovery (EOR) well testing.

Heating Tanks: 50 BBL heating tanks ideally suited for field testing and EPF installation. Custom-designed and equipped with advanced instrumentation, including wave radar systems for accurate measurement of water volume, emulsion layer volume, and oil volume.

Mobile Tanks: 60 m³ mobile crude oil trucks featuring integrated heating systems and robust insulation. Enabling long-distance transport to refinery stations while preserving crude oil at consistently high temperatures.

MPS Echometer System MPS Echometer System MPS Echometer System MPS Echometer System MPS Echometer System

Echo-metering Operations

Fast Rig-up Real-time Data

MPS has developed strong expertise in "Echo-metering operations".

Non-intrusive acoustic surveys enabling fast rig-up and real-time data acquisition on hydrocarbon levels. Optimizing Artificial Lift systems (ESP/Gas Lift) by monitoring annulus liquid levels.

Tree Valve Maintenance

Tree Valve Maintenance

QA/QC History Mgt

Ensuring critical Well Integrity through comprehensive maintenance of Master and Wing valves.

Our Tree Valve Maintenance procedures are meticulously executed to prevent leaks and ensure optimal operation:

Cleaning Greasing Trimming Quality Check Preventive Maintenance
Water Ponds management Water Ponds management Water Ponds management Water Ponds management Water Ponds management

Ecological Remediation (Water ponds & Water pits management)

Floating Evaporators Bio-surfactants

Advanced Produced Water management, significantly reducing environmental footprint and disposal costs.

Utilizing high-performance floating-type evaporators and Mechanical Atomizers (Canon-type) to maximize evaporation rates. Fully automated and integrated with weather forecasting systems to optimize performance.

In collaboration with its trusted overseas suppliers and partners, MPS utilizes specialized solutions to rapidly eliminate oil layers. This is achieved through the application of biological enzymes (bio-surfactants), which effectively break down surface oil into CO₂ and water, ensuring environmentally compliant and efficient remediation.

MPS Flexpipe Coil Drum

Flexpipe Networks

Remote Wells Zero-Leak

Corrosion-resistant composite flowlines for remote, hard-to-access wells.

Installation of high-pressure flexpipe networks ensuring zero-leak integrity and rapid deployment for remote operations. Equipped with dedicated coil drums for efficient spooling and laying of pipelines over challenging terrains.

MPS Slickline Cable Drum MPS Slickline Operation MPS Slickline Collar unit MPS downhill memory gauges smart MPLT MPS Slickline Unit MPS Slickline Equipment

Slickline Service & Data Acquisition System

Telemetry Smart MPLT

Rig and Rigless operation including real time operation via a special bridded cable drum fitted with a coaxial cable for data transmition and telemetry.

Our advanced Slickline services include the deployment of high-tier data acquisition systems:

  • Downhole memory gauges – Smart MPLT recording Pressure/Temperature Drawdown & Buildup data for high-precision reservoir analysis.
  • Complete Collar Unit operations for optimal downhole interventions.
Early Production Facility

Early Production Facility (EPF) & Tank Farms

Lifecycle Comm Pressurized Tanks

Full lifecycle installation, commissioning, and operations management capability for rapid field development.

Fast-track integrated solutions enabling operators to accelerate production and monetization, bridging the gap before Central Processing Facilities (CPF) completion. Includes tank farm installation with atmospheric and/or pressurized tanks.

MPS technician field training MPS technician field training MPS QHSE safety training session MPS QHSE safety training session MPS competency program MPS competency program
QHSE Certified

Investment in People

Elite equipment means nothing without elite minds. MPS invests aggressively in comprehensive competency programs driven by top management's vision.

Our technicians deploy absolute operational superiority under the most stringent QHSE protocols — ensuring every deployment meets the highest international safety and performance standards.

100%

Certified Techs

Zero

Safety Incidents

24/7

Field Ready
H₂S Safety Well Control First Aid Fire Fighting Surface Testing

Field-Tested in Algeria's Toughest Terrain

A mega-scale, prolonged clean-up operation utilizing an advanced Sand Management System was executed flawlessly in South Algeria (Roud El Nouss) — one of the most mechanically and environmentally demanding hydrocarbon sectors on the planet.

This operation demonstrated our unmatched operational efficiency, field expertise, and absolute commitment to zero-incident performance under extreme well conditions.

South Algeria

Roud El Nouss region

Extended Duration

Long-duration clean-up op

Zero Incidents

Flawless safety record

Let's Engineer Your Next Success

Whether you need rapid well testing deployment, advanced sand management, or ecological remediation — our engineering team is ready to mobilize.